Current Map Survey of Şanlıurfa Light Rail Systems
Şanlıurfa Light Rail Systems – Current Map Survey
Within the scope of the Şanlıurfa Light Rail Systems Project, the production of topographic maps of the route and its surroundings has been carried out. During the four-day field work, positional data was collected using a high-precision RTK GNSS system , and topographic maps were prepared based on the measurements obtained, which will form the basis for infrastructure planning and design studies .
Project Details

Yuksel Project
Contractor

KG Engineering
Subcontractor
4
Duration
Project Galery